Cipher

Building next-generation data centers for advanced compute. 600MW contracted capacity, 3.2GW pipeline, 327MW operating. Trusted by Google, AWS, and Fluidstack.

Have feedback or a question related to this item? Drop us some feedback!

Curated: 
3.5.26

Similar items

Items
2805
Search

Mel Chiri Consulting

1.12.26

Rune

8.2.24

Decoding Bio

5.29.24

TripSuite

4.23.24

Weaverbird

12.8.25

Listen to the Restock Podcast

View Listen to the Restock Podcast

OneTech

12.1.25

Athlee

10.3.25

Sunrise Robotics

9.24.25

Streamline Defense

9.3.25

Get hired with Liftoff

View Get hired with Liftoff

Duracell

8.29.25

Normal

7.15.25

Bee

5.1.25

Hartmann Capital

10.8.24

21Oaks

8.11.26

Haven Foods

5.30.26

Ginger's Pop-ups

5.5.26

ORDR

5.1.26

Runway

4.24.26

General Dental

4.21.26

A Better Lou

4.21.26

Yama

4.20.26

Primer

4.13.26

Bummer, no results

Try a different search/filter combo, or drop us some feedback if there is something missing you would love to see!

Reset filters

Subscribe for updates

Get updates on the latest curated resources and be the first to hear of new features.

Subscribe